So we started with a little demo of the shower and saved the tub
[caption id="attachment_1238" align="aligncenter" width="300" caption="Before"]

[caption id="attachment_1239" align="aligncenter" width="300" caption="After demo"]

Then there was time for some insulation and plastic wrap and even some concrete board and green board going up.
[caption id="attachment_1240" align="aligncenter" width="225" caption="Insulation & Wrap"]

After a small trip to Chicago we completed the drywall process and were so happy to see 3 complete walls again.
[caption id="attachment_1241" align="aligncenter" width="300" caption="Concrete board & Green board"]

Then it was time to pick out the tile and make this a real shower once again, but first everyone had to sign the wall!

After the wall was signed it really needed some tile.
[caption id="attachment_1245" align="aligncenter" width="300" caption="Tile Day 1"]

[caption id="attachment_1246" align="aligncenter" width="300" caption="Completed tile"]

And now on to grouting and mudding the green board before painting.